The product is composed of titanium filter disc, 316L stainless steel housing, 316L stainless steel flange, and sparger gasket. The titanium filter disc is sintered with high-purity titanium powder, and the sparger gasket is a leak-proof gasket specially designed for the spargers by our company.

High compressive strength, high temperature resistance and long service life;
Removable for cleaning and reuse;
The pore size is uniform and small, the distribution range is narrow, and the bubbles generated are small;
High porosity, low aeration resistance, high aeration efficiency;
No particles fall off and will not cause secondary pollution to the original liquid.

Titanium disc shape spargers aeration flow diagram (in water test)

| No. | Model | Air outlet diameter (mm) | Height (mm) | Connection | AerationArea(㎡) (water depth above 4 meters) | O2 utilizationRatio |
| 1 | JTBQB-100 | ф100 | 60 | R 1/2'' | 0.4 | 32.22-45.33% |
| 2 | JTBQB-150 | ф150 | 68 | R 1/2'' | 0.8 | 32.22-45.33% |
| 3 | JTBQB-200 | ф200 | 83 | R 1/2'' | 1 | 32.22-45.33% |
FAQ About Sintered Porous Metal Filter
Our porous titanium disc spargers can be evaluated for water treatment and industrial gas-liquid processes according to gas flow, liquid depth, installation space and operating conditions.
Application Requirement | Recommended Configuration Approach |
|---|---|
Uneven gas distribution | Evaluate disc diameter, installation position and multiple sparger arrangements |
High pressure drop | Assess gas flow requirements and porous disc permeability |
Limited installation space | Select a suitable disc diameter and connection arrangement |
Frequent maintenance | Consider removable assemblies for inspection and cleaning |
Corrosive process liquids | Review titanium compatibility and gasket material requirements |
Existing tank upgrades | Check connection dimensions, tank depth and available mounting space |
Customization | Available Scope / Information Required |
|---|---|
Disc Diameter | Standard models: 100, 150 and 200 mm; other dimensions subject to evaluation |
Porous Material | Titanium; other materials subject to feasibility review |
Pore Characteristics | Specify required gas distribution and permeability |
Housing & Connection | Review housing dimensions, thread and mounting requirements |
Gasket | Select according to operating temperature and liquid compatibility |
Operating Conditions | Provide gas type, flow rate, pressure, temperature and water depth |
MOQ: Confirmed according to model, quantity and customization requirements.
Lead Time: Quoted based on product configuration and production schedule.
Samples: Availability for evaluation can be discussed before bulk ordering.
Technical Support: Model selection, connection matching and gas distribution requirements.
Drawings: Submit tank or installation drawings for configuration review.